Winton Soar Farm, 100MWP, Australia

Client:

Winton Soar Farm

Location:

Wangaratta, near the town of Winton, Benalla in central north Victoria, Australia

Duration:

21 Months

Challenge:

Extended construction period due to seasonal weather changes. Coordination of multiple contractors across a large remote site. Logistics complexity in transporting materials in rural Victoria.

Tasks:

Structure assembly, module mounting, and DC cabling installation.

Site Area:

700 Acres

DC Power Capacity:

100 MWP

Total Panels Installed:

160,000 Panels

Average Manpower:

140 People