Vlowijker, 13.42MWP, Netherland
Client:
Vlowijker II Power Plant
Location:
Vlowijker II, Netherland
Duration:
9 Months
Challenge:
Muddy terrain and frequent rainfall during spring and autumn seasons. Coordination with multiple international teams under a 9‑month construction schedule.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
94 Acres
DC Power Capacity:
13.42 MWP
Total Panels Installed:
21,472 Panels
Average Manpower:
55 People