SINO-CEEF, 51.42MWP, Poland
Client:
SINO-CEEF
Location:
Poland
Duration:
20 Months
Challenge:
Multi‑site solar project distributed across 53 locations in Poland. Faced logistical challenges due to simultaneous construction, variable site conditions, and coordination with international teams during the COVID‑19 period.
Tasks:
Structure assembly, module mounting, and DC cabling installation across all distributed sites.
Site Area:
350 Acres
DC Power Capacity:
51.42 MWP
Total Panels Installed:
82,272 Panels
Average Manpower:
120 People