SINO-CEEF, 51.42MWP, Poland

Client:

SINO-CEEF

Location:

Poland

Duration:

20 Months

Challenge:

Multi‑site solar project distributed across 53 locations in Poland. Faced logistical challenges due to simultaneous construction, variable site conditions, and coordination with international teams during the COVID‑19 period.

Tasks:

Structure assembly, module mounting, and DC cabling installation across all distributed sites.

Site Area:

350 Acres

DC Power Capacity:

51.42 MWP

Total Panels Installed:

82,272 Panels

Average Manpower:

120 People