RWE, 25MWP, Poland

Client:

RWE

Location:

Poland

Duration:

15 Months

Challenge:

Single‑site solar project in Poland with challenging winter and rainy seasons. Coordination with international contractors under a 15‑month construction schedule.

Tasks:

Structure assembly, module mounting, and DC cabling installation.

Site Area:

175 Acres

DC Power Capacity:

25 MWP

Total Panels Installed:

40,000 Panels

Average Manpower:

80 People

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.