Rosh Pinah, 100MWP, Namibia

Client:

Rosh Pinah

Location:

Namibia

Duration:

6 Months

Challenge:

Remote desert location with limited infrastructure access. Extreme temperatures and mobilization in arid conditions demand robust planning and resource management.

Tasks:

Structure assembly, module mounting, and DC cabling (planned scope under mobilization).

Site Area:

700 Acres

DC Power Capacity:

100 MWP

Total Panels Installed:

160,000 Panels

Average Manpower:

160 People

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.

Subscribe To Get Updated

Follow Us