Rosh Pinah, 100MWP, Namibia
Client:
Rosh Pinah
Location:
Namibia
Duration:
6 Months
Challenge:
Remote desert location with limited infrastructure access. Extreme temperatures and mobilization in arid conditions demand robust planning and resource management.
Tasks:
Structure assembly, module mounting, and DC cabling (planned scope under mobilization).
Site Area:
700 Acres
DC Power Capacity:
100 MWP
Total Panels Installed:
160,000 Panels
Average Manpower:
160 People