Resko Solar Plant, 51.7MWP, Sosnowo and Sosnówko, RESKO, Poland
Client:
Resko Solar Plant
Location:
Sosnowo and Sosnówko, RESKO, Poland
Duration:
11 Months
Challenge:
Large‑scale solar project across Sosnowo and Sosnówko in Poland, facing wet winter conditions and logistical challenges. Coordination with international contractors over a 2‑year construction period.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
105 Acres
DC Power Capacity:
51.7 MWP
Total Panels Installed:
82,720 Panels
Average Manpower:
100 People