NOOR PV 1, 177MWP, Morocco

Client:

NOOR PV 1 Solar Power Plant

Location:

Ouarzazate,Laayoune and Boujdour

Duration:

15 Months

Challenge:

Remote desert locations with extreme heat and dust conditions. Logistical challenges across three distant regions required high-efficiency coordination and durable installation planning.

Tasks:

Structure assembly, module mounting, and DC cabling across Ouarzazate, Laayoune, and Boujdour.

Site Area:

1,239 Acres

DC Power Capacity:

177 MWP

Total Panels Installed:

283,200 Panels

Average Manpower:

300 People

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.

Subscribe To Get Updated

Follow Us