Kampen, 19MWP, Netherland
Client:
Kampen Power Plant
Location:
Kampen, Netherlands
Duration:
5 Months
Challenge:
Sandy and uneven ground conditions with occasional rain. Coordination with multiple international subcontractors under a tight 5‑month schedule.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
133 Acres
DC Power Capacity:
19 MWP
Total Panels Installed:
30,400 Panels
Average Manpower:
70 People