Insua, 48.5MWP, Portugal

Client:

Insua

Location:

Municipality of Serpa, Portugal

Duration:

12 Months

Challenge:

Year-long project with seasonal weather variations, including heavy rains and muddy conditions. Coordination with multiple international teams on a large‑scale solar installation.

Tasks:

Structure assembly, module mounting, and DC cabling installation.

Site Area:

340 Acres

DC Power Capacity:

48.5 MWP

Total Panels Installed:

77,600 Panels

Average Manpower:

100 People

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.