Goonumbla, 5.86MWP, Australia
Client:
Goonumbla Solar Farm
Location:
"Pat Meredith Drive 2870 Parkes, New South Wales"
Duration:
11 Months
Challenge:
Large-scale project in regional New South Wales with varying terrain and weather conditions. Required extensive logistics coordination, multiple workfronts, and collaboration among international contractors.
Tasks:
Structure assembly, module mounting, and DC cabling installation across multiple zones.
Site Area:
623 Acres
DC Power Capacity:
89 MWP
Total Panels Installed:
142,400 Panels
Average Manpower:
180 People