De Ekers, 13.8MWP, Netherland
Client:
De Ekers Power Plant
Location:
De Ekers, Netherland
Duration:
5 Months
Challenge:
Cold winter start with frequent rainfall and muddy conditions. Coordination with multiple international contractors under a 5‑month schedule.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
55 Acres
DC Power Capacity:
13.8 MWP
Total Panels Installed:
22,080 Panels
Average Manpower:
55 People