Buinerveen, 44MWP, Netherland
Client:
Buinerveen Solar Power Plant
Location:
Buinerveen
Duration:
6 Months
Challenge:
Soft soil and muddy conditions during spring and autumn. Tight construction schedule requiring coordination with multiple international subcontractors amid weather fluctuations.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
310 Acres
DC Power Capacity:
44 MWP
Total Panels Installed:
70,400 Panels
Average Manpower:
120 People