Buinerveen, 44MWP, Netherland

Client:

Buinerveen Solar Power Plant

Location:

Buinerveen

Duration:

6 Months

Challenge:

Soft soil and muddy conditions during spring and autumn. Tight construction schedule requiring coordination with multiple international subcontractors amid weather fluctuations.

Tasks:

Structure assembly, module mounting, and DC cabling installation.

Site Area:

310 Acres

DC Power Capacity:

44 MWP

Total Panels Installed:

70,400 Panels

Average Manpower:

120 People

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.