Boksveenweg, 11.72MWP, Netherland
Client:
Boksveenweg Power Plant
Location:
Boksveenweg, Netherland
Duration:
7 Months
Challenge:
Rainy spring and soft soil conditions created logistical challenges. Coordination with multiple international contractors to meet a 7‑month construction schedule.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
82 Acres
DC Power Capacity:
11.72 MWP
Total Panels Installed:
18,752 Panels
Average Manpower:
50 People