BESS – Weissenfels , 12MW/40MWh, Germany
Client:
-
Location:
Weissenfels , Germany
Duration:
-
Challenge:
The project is located in Weissenfels Germany, with a total of 1site. The project uses Chint Power's latest 5MWh liquid cooling system and SMA 4.6MW MVPS to reduce the system's footprint; at the same time, BESS is pre-installed and shipped, which greatly saves on-site construction time and costs. The system been integrated by Chint power with total 8sets 5MWh containers, and each MVPS connected with 2sets of containers. This is a complete solution for the project that includes the EMS/SCADA/PPM and PCS/Transformer/battery system.