BESS – Konya, 10MW/10MWh PV+ Battery project, Turkey
Client:
-
Location:
Konya, Turkey
Duration:
-
Challenge:
The project is located in the desert area of Urfa, Turkey, which is characterized by sand, dust, high temperature, and weak grid. The construction and application environment of the project is relatively harsh. The 20ft container product of Chint Power adopt a fully integrated, fully pre-installed and fully tested product solution. There is no need for installation on the project site, and it can be delivered and debugged quickly. The high specific energy product design greatly reduces the installation space on site and saves construction costs. The system integrated with local controller and PCS and battery in a single container, which is a completed solution without any extra installation and commission work on site.
Tasks:
-
Site Area:
-
DC Power Capacity:
-
Total Panels Installed:
-
Average Manpower:
-