BESS – 2.4MW/10 MWh Battery Project, Ukraine

Client:

Chint

Location:

Ukraine

Duration:

-

Challenge:

The project is located in the Mykolaiv Region of Ukraine and consists of six 2.4 MW/10 MWh dual-stage, grid-forming systems integrated with 15 MW of solar PV capacity. The first 30 MWh phase has been successfully connected to the grid and is fully operational. Despite significant infrastructure challenges in the region, the installation enhances grid stability and energy resilience while optimizing solar utilization through peak shaving and valley filling. This milestone marks an important step toward rebuilding a sustainable and independent energy future for Ukraine.

Tasks:

-

Site Area:

-

DC Power Capacity:

-

Total Panels Installed:

-

Average Manpower:

-

At HST Nordic (559519-9372), we engineer, procure, and construct high-impact renewable energy and industrial projects across Sweden and beyond. As part of a globally recognized industrial group, we deliver turnkey solar, BESS, and green infrastructure solutions that power progress.

Subscribe To Get Updated

Follow Us