Astroser-Serenyfalva, 37MWP,Hungary
Client:
Astroser-Serenyfalva
Location:
Miscolc, Hungary
Duration:
10 Months
Challenge:
Large‑scale solar project in Hungary with late‑summer start, facing autumn rains and winter frost. Required coordination with multiple international contractors on a 10‑month schedule.
Tasks:
Structure assembly, module mounting, and DC cabling installation.
Site Area:
259 Acres
DC Power Capacity:
37 MWP
Total Panels Installed:
59,200 Panels
Average Manpower:
80 People